The Project will include the construction of approximately 4 kilometres (km) of pipe 324 millimeters in diameter for transporting natural gas. It will parallel the existing Canadian Mainline, and will start at the Saint-Sébastien Meter Station near route 133 and end at a new proposed valve and receiver site in the municipality of Pike River, near Chemin Molleur.
The Tula - Villa de Reyes (TVDR) Project stretches over 420 km in the heartland of Mexico, including mountain ranges and several river crossings, which have put to test not only the technical skills, but also the safety procedures of both TC Energía and our contractors. Despite some challenges, TC Energía’s team has achieved over 1.6 million hours without recording a lost-time incident. Learn how it was done.
The horizontal directional drilling (HDD) the Northern Courier Project completed under the Athabasca River in Alberta, Canada, turned out to be the longest 42-inch-wide HDD completed in North America to date at 2,195 metres (7,200 feet), in order to install the pipeline 70 metres below the riverbed.
After heavy flooding exposed pipelines at river crossings, TransCanada used innovative and creative bioengineering solutions to "re-train" the rivers to protect the pipelines, reduce the company's environmental footprint, and create a new habitat for fish. To date, TransCanada’s engineering solutions have met with success, with the provincial regulator approving the engineering practices as a permanent solution.
tce-FERC-TransCanada-Keystone-Tariff-Index-September-1-2024.pdf