Results 441 to 450 of 3175 for “ngtl pipeline”
FERC No. 2.43.0 – Local Pipeline Tariff Containing Rates Applying to the Transportation of Petroleum (effective February 1, 2022)
FERC No. 6.71.0 – Local Pipeline Tariff Containing Rates Applying to the Transportation of Petroleum (effective February 1, 2022)
Commitment Tracking Table No. 5
Sundre Crossover — Commitment-tracking Table No. 18
HOUSTON, Jan. 17, 2021 (GLOBE NEWSWIRE) -- Media Advisory - TC Energy Corporation (TSX, NYSE: TRP) (TC Energy or the company) today announced a new sustainable energy initiative for the Keystone XL Project. The company will achieve net zero emissions across the project operations when it is placed into service in 2023 and has committed the operations will be fully powered by renewable energy sources no later than 2030. This announcement comes after an extensive period of study and analysis, a...
FERC No. 2.42.0 – Local Pipeline Tariff Containing Rates Applying to the Transportation of Petroleum (effective January 1, 2022)
The proposed McLeod South Project is 48-inch diameter pipeline that would be located entirely within Yellowhead County, Alberta.