Results 441 to 450 of 4435 for “a partner in progress”
As Director of Operations for TC Energy's Gulf Region based in Houston, Desiree Cromwell leads a team of 170 field employees who operate assets stretching from Indiana to Louisiana. For Desiree, leadership isn't just about managing compressor stations and pipelines.
tce-elt-bio-greg-grant.pdf
The Project consists of a 206 kilometre (km), 42-inch pipeline, two compressor stations, and 14 meter stations. It will begin at a the northern point of the existing Saturn section of the Groundbirch Mainline at 14-21-80-20-W6M and terminate at the Blair Creek Receipt Meter Station located in Unit 30, Block K, Group 94-G-7.
NGTL GP is proposing to decommission 11 laterals or loops and one co-located meter station on the NGTL System as these assets are no longer required to meet customer demand.