Results 431 to 440 of 2373 for “ngtl system”
North Montney Mainline Project — Commitment Tracking Table No. 82
NGTL encloses its Commitment Tracking Table No. 1. This submission is in response to both Section 52 Condition 6 and Section 58 Condition 7 located in Appendices II and III of the Report.
tce-Conflict-Check-US-Canada-Mexico-Entities.pdf
Located entirely within the Municipal District of Bonnyville, this pipeline is south of the City of Cold Lake, Alberta, and is connected to the NGTL System. The existing Cold Lake Border Sales metering facility was replaced with a new metering facility to accommodate the additional gas volumes.
The proposed Grande Prairie Mainline Loop No. 4 (Valhalla North Section) and Berland River Compressor Station C3 Unit Addition will increase natural gas transportation service on our existing natural gas pipeline system in Alberta to meet growing demand.
2021 Meter Stations and Laterals Abandonment Program Fact Sheet
TC Energy is pleased that the Government of Canada has approved the NOVA Gas Transmission Limited (NGTL) West Path Delivery 2023 Project, part of the West Path Delivery Program, after a robust assessment by the Canada Energy Regulator (CER).