Results 431 to 440 of 4191 for “a partner in progress”
CALGARY, Alberta, May 01, 2025 (GLOBE NEWSWIRE) — TC Energy Corporation released its first quarter results today. François Poirier, TC Energy’s President and Chief Executive Officer commented, "As natural gas and electricity are forecasted to drive the majority of growth in final energy consumption through 2035, we are pleased to announce two new growth projects that represent strategic investments in North America’s energy future.
tce-Keystone-FERC-7.31.0-IJT-Rate-Schedule.pdf
NGTL GP is proposing to decommission 11 laterals or loops and one co-located meter station on the NGTL System as these assets are no longer required to meet customer demand.
The Project will include the construction of approximately 4 kilometres (km) of pipe 324 millimeters in diameter for transporting natural gas. It will parallel the existing Canadian Mainline, and will start at the Saint-Sébastien Meter Station near route 133 and end at a new proposed valve and receiver site in the municipality of Pike River, near Chemin Molleur.
tce-tcenergy-lobbying-infosheet.pdf
TC Energy Lobbying Information Sheet