Results 421 to 430 of 2339 for “construction manager”
In response to growing peak day requirements and reliability needs of local distribution companies (LDC) and customers in the region, TC Energy is proposing to build the Southeast Virginia Energy Storage Project
The Project will include the construction of approximately 4 kilometres (km) of pipe 324 millimeters in diameter for transporting natural gas. It will parallel the existing Canadian Mainline, and will start at the Saint-Sébastien Meter Station near route 133 and end at a new proposed valve and receiver site in the municipality of Pike River, near Chemin Molleur.
The proposed Leming Lake Sales Lateral Loop (Field Lake Section) Project will increase natural gas transportation service on our existing NGTL natural gas pipeline system in Alberta to meet growing demand.
Nikola and TC Energy announce a strategic collaboration aimed at the development, construction, ownership and/or operation of critical hydrogen infrastructure for hydrogen fueled zero-emission heavy-duty trucks.
CEO-Zero-is-real-Leadership-Awards-Booket.pdf
As part of TC Energy’s commitment to environmental stewardship and advancing reconciliation between Indigenous and non-Indigenous peoples, the West Path Delivery Program Foothills 2023 Elko section recently invested in the expansion of the Nupqu Native Plant Nursery capacity to grow Whitebark Pine seedlings, with the aim to restore the threatened tree species in southeastern B.C.
Brent McDonald share's his work experience as a participant Aboriginal Construction Participation Program (ACPP) . From the Aseniwuche Winewak Nation he represented his community in the ACPP on the Robb Section of the 2021 NGTL System Expansion Project.
We can confirm there was an incident at the construction site on the Northwest Mainline (NWML) Loop No. 2 Bear Canyon North Extension section of the North Corridor Expansion Project, near Fairview, Alta. on Aug. 26, 2022. A worker was performing planned construction activities on site and suffered a non-life-threatening injury. Our emergency procedures were activated and work on-site was immediately suspended. Emergency crews transported the worker by ambulance to the nearest hospital.
The fact sheet describes key points about Vaughan Mainline Expansion Project.