Results 421 to 430 of 4191 for “a partner in progress”
TCEnergy-Alberta-Tier3-Emergency-Response-Plans.pdf
tce-keystone-ferc-no.-6.79.0-rate-schedule.pdf
The Project consists of a 206 kilometre (km), 42-inch pipeline, two compressor stations, and 14 meter stations. It will begin at a the northern point of the existing Saturn section of the Groundbirch Mainline at 14-21-80-20-W6M and terminate at the Blair Creek Receipt Meter Station located in Unit 30, Block K, Group 94-G-7.
This report investigates the possible implementation of nuclear power (SMRs) in the oil sands to reduce greenhouse gas (GHG) emissions and produce steam, and electricity for use at in-situ recovery facilities utilizing Steam Assisted Gravity Drainage (SAGD) for bitumen production.
2021-tc-pipelines-lp-fourth-quarter-financial-statements.pdf
TransCanada Corporation (TSX:TRP) (NYSE:TRP) (TransCanada) announced today that it will proceed with construction of the Coastal GasLink pipeline project (Coastal GasLink) after a decision to sanction the LNG Canada natural gas liquefaction facility in Kitimat, British Columbia (B.C.) was announced earlier today by the joint venture participants of LNG Canada, a consortium comprised of Shell, PETRONAS, PetroChina, Mitsubishi Corporation and KOGAS (the LNG Canada Participants).