Results 4251 to 4260 of 4535 for “trabajos en tc energia'”
Spanning more than 420 km (261 miles) from Tula, Hidalgo, and ends in Villa de Reyes, San Luis Potosí, the completed Villa de Reyes Pipeline will transport natural gas to power generation facilities in Central Mexico.
The Tamazunchale Pipeline is a 370 km (230 miles) natural gas pipeline, comprised of two segments: Naranjos – El Sauz (130 km) and Tamazunchale - El Sauz, better known as the Tamazunchale Extension (240 km). The pipeline serves communities on the East Coast of Mexico and Central Mexico.
The Guadalajara Pipeline connects to an LNG facility located near Manzanillo on the Pacific Coast of Mexico. It has capacity to transport 500 million cubic feet of natural gas per day to a nearby power plant and transport 320 million cubic feet per day to a pipeline system near Guadalajara.
Over the past few months, we’ve transitioned into a reality which includes living with COVID-19. Now we are learning how to carefully manage this risk and move forward – slowly reopening and recovering the economy while balancing safety and health precautions.
In accordance with Certificate Condition 6 and Order Condition 7, NGTL encloses Commitment Tracking Table No. 9 for the Project. The reporting period for this submission is September 29, 2017 to October 27, 2017.
The Grand Rapids Pipeline System is delivering crude oil on behalf of our customers. Jointly owned by TransCanada and PetroChina Canada Ltd., formerly Brion Energy Corporation, the 460 km (287 mile) Grand Rapids Pipeline System plays a key role in connecting producing areas northwest of Fort McMurray, Alta., to terminals in the Edmonton/Heartland region.
n accordance with Certificate Condition 21 and Condition 5 of the Order, NGTL encloses the Commitment Tracking Table for the Project. The reporting period for this submission is June 16, 2017 to July 15, 2017.
The Towerbirch pipeline project will include 55 km of 36-inch pipeline paralleling the existing NGTL Groundbirch Mainline, along with new meter stations, and expansion of one meter station. The majority of this projects scope will be within British Comumbia, with only a portion in Alberta.
How Canadian energy can help strengthen Canada’s economic sovereignty.
In accordance with Certificate Condition 21 and Condition 5 of the Order, NGTL encloses the Commitment Tracking Table for the Project. The reporting period for this submission is May 15, 2017 to June 15, 2017.