Results 4041 to 4050 of 4191 for “a partner in progress”
Peace River Mainline Abandonment Map
The 266 km (165 mile) south section of the Peace River Mainline (part of the NGTL System) will be retired.
WB Xpress Project Map
With this project, 2.9 miles (4.7 km) will be built along with two compressor stations and replacement of 26 miles (41.8) of existing pipeline. The changes will increase capacity by 1.3 billion cubic feet per day.