The Mazatlan Pipeline Project has 430 km (267 miles)of pipeline in length. It's estimaed to carry 202 million cubic feet per day of natural gas.
With this project, 2.9 miles (4.7 km) will be built along with two compressor stations and replacement of 26 miles (41.8) of existing pipeline. The changes will increase capacity by 1.3 billion cubic feet per day.
A natural gas pipeline that will stretch 287 km (178 miles) from end to end, the Tula Pipeline Project will safely deliver fuel from Tuxpan, Veracruz, to communities in the states of Puebla and Hidalgo.
The 430 km (267 mile) Mazatlán Pipeline will safely deliver natural gas to CFE’s Mazatlán power plant and other large areas in Sinaloa.
The Project will include the construction of approximately 4 kilometres (km) of pipe 324 millimeters in diameter for transporting natural gas. It will parallel the existing Canadian Mainline, and will start at the Saint-Sébastien Meter Station near route 133 and end at a new proposed valve and receiver site in the municipality of Pike River, near Chemin Molleur.