Results 3831 to 3840 of 3950 for “contractor log in to safety training”
CALGARY, ALBERTA--(Marketwire - March 22, 2013) - TransCanada Corporation (TSX:TRP) (NYSE:TRP) (TransCanada) announced the retirement of Dr. Paul Joskow as a director of TransCanada, effective March 22, 2013. Dr. Joskow has been a valuable member of the Board of Directors of TransCan...
CALGARY, ALBERTA--(Marketwire - Jan. 10, 2013) - TransCanada Corporation (TSX:TRP) (NYSE:TRP) (TransCanada) announced the retirement of Mr. John A. MacNaughton as a Director of TransCanada, effective January 9, 2013. Mr. MacNaughton advised the Board of Directors that he is retiring ...
The 266 km (165 mile) south section of the Peace River Mainline (part of the NGTL System) will be retired.
The Foothills System is a 1,241 km (771 mile) long network of pipelines comprising the Foothills B.C. and Foothills Saskatchewan lines.
With this project, 2.9 miles (4.7 km) will be built along with two compressor stations and replacement of 26 miles (41.8) of existing pipeline. The changes will increase capacity by 1.3 billion cubic feet per day.