Results 371 to 380 of 1882 for “field visit”
Commitment Tracking Table No. 5
Commitment Tracking Table No. 5
Towerbirch — Commitment Tracking Table No. 9
In accordance with Certificate Condition 6 and Order Condition 7, NGTL encloses Commitment Tracking Table No. 9 for the Project. The reporting period for this submission is September 29, 2017 to October 27, 2017.
2021 NGTL System Expansion — Commitment Tracking Table No. 20
2021 NGTL System Expansion — Commitment Tracking Table No. 20
TC Energy — Trans Québec & Maritimes Pipeline (TQM)
Trans Québec & Maritimes Pipeline (TQM) has been operational since 1982 and has operated a gas transmission system since 1982. The pipeline connects with the Canadian Mainline near the Ontario/Québec border to transport natural gas to the Montréal and Québec City corridor, and interconnects with the Portland Natural Gas Transmission System from the Northeast US.
Commitment Tracking Table No. 4
Commitment Tracking Table No. 4