Showing results 361 to 370 of 1623 for “contact phone”
tce-C23743-1_2021_NGTL_System_Expansion_-_Condition_16_and_14_Commitments_Tracking_Table_No._31_-_A8L2A9.pdf
NGTL — Condition 4 — Commitments Tracking Table No. 30
TC Energy is constructing and will own and operate four separate projects as part of the West Path Delivery Program located within Alberta and British Columbia. These projects are necessary to supply growing demand in southwest Alberta, southern B.C. and downstream North American markets for natural gas produced in Western Canada.
The Foothills Natural Gas Pipeline System ships WCSB natural gas to the U.S. border for export.
The Redwater Cogeneration Plant, located at Williams Energy Canada Fractionation and Storage Plant in Redwater, Alta., has provided the province with approximately 46 megawatts of electricity since 2001.
MacKay River is an industrial cogeneration project that is situated on Suncor’s MacKay River oil sands development, 60 km (37 miles) west of Fort McMurray, Alta.