Results 3551 to 3560 of 3980 for “ngtl point to point service”
With a history of safe nuclear generation dating to 1967, Bruce Power currently supplies roughly 30% of Ontario’s electricity.
CALGARY, Alberta, Aug. 12, 2021 (GLOBE NEWSWIRE) -- Media Advisory – TC Energy Corporation (TSX, NYSE: TRP) (TC Energy) and privately held Irving Oil have signed a memorandum of understanding (MOU) to explore the joint development of a series of proposed energy projects focused on reducing greenhouse gas emissions and creating new economic opportunities in New Brunswick and Atlantic Canada. Together, the two energy companies have identified a series of potential projects for exploration focus...
The Redwater Cogeneration Plant, located at Williams Energy Canada Fractionation and Storage Plant in Redwater, Alta., has provided the province with approximately 46 megawatts of electricity since 2001.
The Foothills System is a 1,241 km (771 mile) long network of pipelines comprising the Foothills B.C. and Foothills Saskatchewan lines.
With this project, 2.9 miles (4.7 km) will be built along with two compressor stations and replacement of 26 miles (41.8) of existing pipeline. The changes will increase capacity by 1.3 billion cubic feet per day.
The Project will include the construction of approximately 4 kilometres (km) of pipe 324 millimeters in diameter for transporting natural gas. It will parallel the existing Canadian Mainline, and will start at the Saint-Sébastien Meter Station near route 133 and end at a new proposed valve and receiver site in the municipality of Pike River, near Chemin Molleur.