Results 341 to 350 of 4297 for “pipeline terms and conditions”
tce-PNL-RCT-1.0.0-Rules-and-Regs.pdf
NGTL GP is proposing to decommission 11 laterals or loops and one co-located meter station on the NGTL System as these assets are no longer required to meet customer demand.
CALGARY, Alberta, Jan. 23, 2026 (GLOBE NEWSWIRE) -- News Release – TC Energy Corporation (TSX:TRP) (NYSE:TRP) (TC Energy or the Company) today announced that 109,800 of its 12,070,593 fixed rate Cumulative Redeemable First Preferred Shares, Series 5 (Series 5 Shares) have been elected for conversion on Jan. 30, 2026 (the Conversion Date), on a one-for-one basis, into floating rate Cumulative Redeemable First Preferred Shares, Series 6 (Series 6 Shares); and 1,089,726 of its 1,929,407 Series 6 Shares...
TC Energy’s 1,412-mile (2,272-km) Northern Border Pipeline Company (NBPL) connects natural gas reserves in the Western Canada Sedimentary Basin with consumers in the Midwestern U.S. as well as receives and transports U.S.-produced natural gas.
tce-2023-q2-results-presentation.pdf
NGTL System (24,631 km) is connected to one of the largest supply basins on the continent, the Western Canadian Sedimentary Basin (WCSB).