Results 3411 to 3420 of 3704 for “project overview order by 1000-- -”
The map depicts the pipeline locations for NGTL Pipeline System in central Alberta.
The Canadian Mainline is 14,114 km (8,770 mile) in length and safely carries natural gas from the Western Canada Sedimentary Basin (WCSB) to Ontario and beyond. The map depicts the pipeline's central section viewed from Manitoba to Ontario.
The Canadian Mainline pipeline is 4,114 km (8,770 mile) in length and has safely carried natural gas from the Western Canada Sedimentary Basin (WCSB) to Ontario and beyond throughout its history.
The Keystone Pipeline System stretches 4,324 km (2,687 miles) in length delivering crude oil supplies from Alberta, Canada to Texas, United States.
Bear Creek is an industrial cogeneration plant situated on International Paper Grande Prairie pulp mill and Weyerhaeuser saw mill complex. The power plant is configured around a 58 MW natural gas fired turbine.
The map depicts the location the Redwater Cogenerating Station which is north of Alberta's provincial capital, Edmonton Alberta.
The 560 km (348 mile) pipeline connects the states of Chihuahua and Sinaloa, supplying numerous communities along the way.
The 560 km (348 mile) pipeline connects the states of Chihuahua and Sinaloa, supplying numerous communities along the way.
The Guadalajara Pipeline connects to an LNG facility located near Manzanillo on the Pacific Coast of Mexico. It has capacity to transport 500 million cubic feet of natural gas per day to a nearby power plant and transport 320 million cubic feet per day to a pipeline system near Guadalajara.