Results 3371 to 3380 of 4005 for “heart of america”
On the Buckeye XPress (BXP) project in southern Ohio, four state-approved herpetologists are on speed dial with TC Energy’s construction team. Part of the pipeline is near a snake hibernaculum, or winter snake den, where species protected by the state, such as the timber rattlesnake, are known to roam. For that reason, the BXP team has put in place mitigation measures to ensure the safety of snakes—as well as its workers from the venomous reptiles.
tce-C26984-1_CER_No._62_Keystone_IJT_Rates_Tariff_-_A8U0Q3.pdf
The 4D Inspection Tool is a digital, tablet-based inspection reporting platform developed by TC Energy, with Project Consulting Services (PCS), after receiving feedback from the business units, to meet the requirements of our construction projects.
The 4,324-kilometre (2,687-mile) Keystone Pipeline System plays a key role in connecting Alberta crude oil supplies to U.S. refining markets in Illinois, Oklahoma and Texas, as well as connecting U.S. crude oil supplies from the Cushing, Okla., hub to refining markets in the U.S. Gulf Coast through our Marketlink Pipeline System.