Results 3191 to 3200 of 3797 for “safety orientation for contractors”
The Towerbirch pipeline project will include 55 km of 36-inch pipeline paralleling the existing NGTL Groundbirch Mainline, along with new meter stations, and expansion of one meter station. The majority of this projects scope will be within British Comumbia, with only a portion in Alberta.
Since 2001, Carseland has been providing Alberta with up to 95 megawatts of electricity from its industrial cogeneration plant located in Carseland, Alta., at Agrium’s Carseland Nitrogen Operation. View the location map.
The Canadian Mainline is 14,114 km (8,770 mile) in length and safely carries natural gas from the Western Canada Sedimentary Basin (WCSB) to Ontario and beyond. The map depicts the pipeline's western section viewed from Saskatchewan to Manitoba.
The Canadian Mainline is 14,114 km (8,770 mile) in length and safely carries natural gas from the Western Canada Sedimentary Basin (WCSB) to Ontario and beyond. The map depicts the pipeline's northeastern section viewed in province of Ontario.