Results 311 to 320 of 4111 for “maps of pipeline in alberta”
The Colt Project will enhance natural gas transportation on the NGTL System, helping deliver secure, reliable energy to support Alberta's growing needs.
tce-FERC-TransCanada-Keystone-Tariff-Index-Feb-1-2023.pdf
2021 NGTL System Expansion — Commitment Tracking Table No. 46
tce-Keystone-FERC-7.31.0-IJT-Rate-Schedule.pdf
tce-canada-gas-emergency-management-manual-can.pdf
CALGARY, Alberta, March 12, 2020 (GLOBE NEWSWIRE) -- Media Advisory – TC Energy Corporation (TSX, NYSE: TRP) (TC Energy) today announced that its wholly owned subsidiary, NOVA Gas Transmission Ltd. (NGTL), has executed an exclusive letter of intent with Tidewater Midstream and Infrastructure Inc. and TransAlta Corporation to purchase the Pioneer Pipeline for $255 million. The Pioneer Pipeline consists of 131 km of operating pipeline that, upon closing of the transaction, will be integrated...
The Project consists of a 206 kilometre (km), 42-inch pipeline, two compressor stations, and 14 meter stations. It will begin at a the northern point of the existing Saturn section of the Groundbirch Mainline at 14-21-80-20-W6M and terminate at the Blair Creek Receipt Meter Station located in Unit 30, Block K, Group 94-G-7.