Results 301 to 310 of 1601 for “safety director”
TransCanada’s Matt White, Terry Robbins and Roger Curry led the efforts of a Mountaineer XPress construction team in supporting the search and rescue of a lost child in Kenna, West Virginia.
Less than a decade ago, Justin Woulf was stationed in East Paktika, Afghanistan, near the country’s border with Pakistan. He was second in command of about 220 soldiers and wore a great many hats to keep his company functioning at an optimal level. Today, Justin is as an Area Manager for Badger South in U.S. Natural Gas’s (USNG) Heartland Region. While Wisconsin is a far cry from Paktika, he finds himself applying many of the same leadership and creative problem-solving skills at TC Energy that he picked up in the U.S. Army.
The recent completion of the Murray River Horizontal Directional Drill (HDD) marks a huge milestone for Coastal Gaslink – the largest trenchless water crossing on the project has been completed with zero safety incidents. This 1.3 kilometre section of pipe weighs over 1.2 million pounds, and the 48-inch HDD signifies the largest of its kind for TC Energy and one of the longest in North America. Before work could even begin on-site, years of planning went into making sure everything went smoothly in coordination with our prime contractor Surerus Murphy Joint Venture (SMJV).
On the Buckeye XPress (BXP) project in southern Ohio, four state-approved herpetologists are on speed dial with TC Energy’s construction team. Part of the pipeline is near a snake hibernaculum, or winter snake den, where species protected by the state, such as the timber rattlesnake, are known to roam. For that reason, the BXP team has put in place mitigation measures to ensure the safety of snakes—as well as its workers from the venomous reptiles.
Foothills Zone 8 West Path Delivery 2023 -CER request for comments on Potential Conditions