Showing results 291 to 300 of 1454 for “application status”
2021 NGTL System Expansion — Commitment Tracking Table No. 15
tce-USNG-QA-PRO-0002-Inspection-Test-Plan-Procedure-2.pdf
tce-power-energy-solutions-emergency-management-program-manual-can-us.pdf
In accordance with Condition 5 of Order XG-N081-030-2017 for the Project issued by the National Energy Board (Board or NEB) on December 28, 2017, NGTL is posting the Commitment Tracking Table No. 3 for the Sundre Crossover Project. The reporting period for this submission is April 6, 2018 to July 5, 2018.
NGTL GP is proposing to safely abandon 33 meter stations and 37 laterals, loops or producer tie-ins on the NGTL System as these assets are no longer required for transmission services.
Natural Gas is a critical component of any strategy to meet North America’s long-term energy needs and has contributed to reduced greenhouse gas emissions across the continent. The Gas Transmission Northwest XPress Project (GTNXP) is designed to upgrade our system to meet increased demands from our customers in the region, providing the reliable energy to communities throughout the Western U.S. in a safe, responsible, and reliable manner. Gas Transmission Northwest, an interstate natural gas pipeline owned and operated by TC Energy, filed an application before the Federal Energy Regulatory Commission (FERC) in October 2021. Further information regarding GTNXP may be found in a copy of the application filed with FERC.