Results 281 to 290 of 1297 for “ngtl map”
The Mazatlan Pipeline Project has 430 km (267 miles)of pipeline in length. It's estimaed to carry 202 million cubic feet per day of natural gas.
Located in Quebec, Bécancour Cogeneration Plant is a high efficient natural gas facility with a production capacity of 550 MW.
With this project, 2.9 miles (4.7 km) will be built along with two compressor stations and replacement of 26 miles (41.8) of existing pipeline. The changes will increase capacity by 1.3 billion cubic feet per day.
The 430 km (267 mile) Mazatlán Pipeline will safely deliver natural gas to CFE’s Mazatlán power plant and other large areas in Sinaloa.
TC Energy has power assets throughout North America. We are the operator of all of our Energy assets, except for Cartier Wind, Bruce Power and Portlands Energy.
Bruce Power, located on the shores of Lake Huron, between Kincardine and Port Elgin, Ont., is Canada’s first private nuclear generator, providing 30% of Ontario’s electricity and employing more than 4,000 full-time employees.