Results 251 to 260 of 1560 for “active learning value”
TC Energy — Coastal GasLink
The first direct path for Canadian natural gas to global LNG markets, the Coastal GasLink pipeline safely delivers natural gas from the Dawson Creek area to the LNG Canada liquefaction facility near Kitimat, B.C.
NGTL Decommissioning Program (2025)
NGTL GP is proposing to permanently cease operations at 14 lateral pipelines or loops on the NGTL System within Alberta as these facilities are no longer necessary to provide service to customers.
NGTL Abandonment Program (2025)
NGTL is safely ceasing operations at 34 meter stations and 27 lateral pipelines, loops and/or producer tie-ins on the NGTL System as these assets are no longer required for transmission services.