Results 2321 to 2330 of 3240 for “northern border pipeline”
The 266 km (165 mile) south section of the Peace River Mainline (part of the NGTL System) will be retired.
The Foothills System is a 1,241 km (771 mile) long network of pipelines comprising the Foothills B.C. and Foothills Saskatchewan lines.
The Project will include the construction of approximately 4 kilometres (km) of pipe 324 millimeters in diameter for transporting natural gas. It will parallel the existing Canadian Mainline, and will start at the Saint-Sébastien Meter Station near route 133 and end at a new proposed valve and receiver site in the municipality of Pike River, near Chemin Molleur.
CALGARY, Alberta – Aug. 10, 2022 – News Release – TC Energy Corporation (TSX: TRP) (NYSE: TRP) (TC Energy or the Company) today announced that it has completed its previously announced public offering (the Offering) of common shares of the Company (the Common Shares).