Results 2111 to 2120 of 4287 for “general terms and conditions”
The Towerbirch pipeline project will include 55 km of 36-inch pipeline paralleling the existing NGTL Groundbirch Mainline, along with new meter stations, and expansion of one meter station. The majority of this projects scope will be within British Comumbia, with only a portion in Alberta.
Located in Quebec, Bécancour Cogeneration Plant is a high efficient natural gas facility with a production capacity of 550 MW.
The Western Path Delivery project would potentially supply natural gas to southwest Alberta and connected downstream markets with natural gas produced in Western Canada.
Since 2001, Carseland has been providing Alberta with up to 95 megawatts of electricity from its industrial cogeneration plant located in Carseland, Alta., at Agrium’s Carseland Nitrogen Operation. View the location map.
HOUSTON, June 11, 2020 (GLOBE NEWSWIRE) -- Media Advisory – TC Energy Corporation (TSX, NYSE: TRP) (TC Energy) and the TC Energy Foundation are proud to announce the donation of US$50,000 to the University of Houston’s College of Natural Sciences and Mathematics (NSM) to support a summer program that enables high school students interested in science, technology, engineering or math (STEM) majors to prepare for the transition to college. The intensive, nine-week program, TC Energy Summer...
The map depicts the pipeline locations for NGTL Pipeline System in northern Alberta.
The map depicts the pipeline locations for NGTL Pipeline System in southern Alberta.