Results 201 to 210 of 1010 for “mainline”
The Project will include the construction of approximately 4 kilometres (km) of pipe 324 millimeters in diameter for transporting natural gas. It will parallel the existing Canadian Mainline, and will start at the Saint-Sébastien Meter Station near route 133 and end at a new proposed valve and receiver site in the municipality of Pike River, near Chemin Molleur.
The West Path Delivery Program in 2023 includes the Foothills Zone 8 West Path Delivery 2023 Project and the NGTL West Path Delivery 2023 Project. These projects consist of approximately 70 km of 48-inch diameter pipeline expansions and a meter station expansion expected to be completed and in-service by Q4 2023.
TransCanada announced today that its Canadian Mainline began shipping additional Western Canada Sedimentary Basin (WCSB) natural gas to markets in Eastern Canada and the U.S. as part of its Long-Term Fixed Price (LTFP) service.
TransCanada today announced its Northwest Mainline Loop-Boundary Lake pipeline has been placed into service, completing the final section of its 2017 Expansion Program on the NOVA Gas Transmission Ltd. (NGTL) System.
NGTL GP is proposing to safely abandon 33 meter stations and 37 laterals, loops or producer tie-ins on the NGTL System as these assets are no longer required for transmission services.
tce-wisconsin-map.pdf
CALGARY, ALBERTA--(Marketwired - Oct. 5, 2017) - News Release - TransCanada Corporation (TSX:TRP) (NYSE:TRP) (TransCanada) announced today it will no longer be proceeding with its proposed Energy East Pipeline and Eastern Mainline projects. Following is a statement from Tran...
TransCanada Corporation announced today that it will move forward with a $2.4-billion expansion of its NGTL System to connect incremental supply and expand basin export capacity by one billion cubic feet of natural gas per day (Bcf/d) at the interconnection with its Canadian Mainline.
TCEnergy-British-Columbia-Tier3-Emergency-Response-Plans.pdf