Results 11 to 20 of 1793 for “projects 2026”
NGTL GP Decommissioning Program (2026)
NGTL GP is proposing to decommission 11 laterals or loops and one co-located meter station on the NGTL System as these assets are no longer required to meet customer demand.
NGTL GP Abandonment Program (2026)
NGTL GP is proposing to safely abandon 33 meter stations and 37 laterals, loops or producer tie-ins on the NGTL System as these assets are no longer required for transmission services.