Results 11 to 20 of 3631 for “ngtl gas transportation tariff”
NGTL GP is proposing to permanently cease operations at 14 lateral pipelines or loops on the NGTL System within Alberta as these facilities are no longer necessary to provide service to customers.
FERC No. 2.42.0 – Local Pipeline Tariff Containing Rates Applying to the Transportation of Petroleum (effective January 1, 2022)
FERC No. 6.70.0 – Local Pipeline Tariff Containing Rates Applying to the Transportation of Petroleum (effective January 1, 2022)
CER Tariff No. 54 – Petroleum Toll Schedule Containing Tolls Applying to the Transportation of Petroleum (effective January 1, 2022)
NGTL GP is proposing to permanently cease operations at 34 meter stations and 27 lateral pipelines, loops and/or producer tie-ins on the NGTL System within Alberta as these facilities are no longer necessary to provide service to customers.
FERC No. 6.69.0 – Local Pipeline Tariff Containing Rates Applying to the Transportation of Petroleum (effective November 1, 2021)
FERC No. 6.68.0 – Local Pipeline Tariff Containing Rates Applying to the Transportation of Petroleum (effective October 1, 2021)
The NGTL System can be the start of moving a molecule of gas from northeast B.C. to Mexico City. Is the NGTL System a part of your life?