Results 1951 to 1960 of 3454 for “tariff columbia gas”
In accordance with Certificate Condition 21 and Condition 5 of the Order, NGTL encloses the Commitment Tracking Table for the Project. The reporting period for this submission is September 15, 2016 to October 15, 2016.
In accordance with Certificate Condition 21 and Condition 5 of the Order, NGTL encloses the Commitment Tracking Table for the Project. The reporting period for this submission is October 15, 2016 to November 15, 2016.
In accordance with Certificate Condition 21 and Condition 5 of the Order, NGTL encloses the Commitment Tracking Table for the Project. The reporting period for this submission is December 15, 2016 to January 15, 2017.
NGTL is safely ceasing operations at 34 meter stations and 27 lateral pipelines, loops and/or producer tie-ins on the NGTL System as these assets are no longer required for transmission services.
The fact sheet describes key points about MacKay River Plant.
tc-energy-2022-q4-results-presentation.pdf