Results 1881 to 1890 of 3777 for “sign in”
This annual report is a comprehensive report on a company's activities throughout the preceding year.
The recent completion of the Murray River Horizontal Directional Drill (HDD) marks a huge milestone for Coastal Gaslink – the largest trenchless water crossing on the project has been completed with zero safety incidents. This 1.3 kilometre section of pipe weighs over 1.2 million pounds, and the 48-inch HDD signifies the largest of its kind for TC Energy and one of the longest in North America. Before work could even begin on-site, years of planning went into making sure everything went smoothly in coordination with our prime contractor Surerus Murphy Joint Venture (SMJV).
NGTL is proposing to permanently cease operations at seven meter stations and 37 lateral pipelines, loops and/or producer tie-ins on the NGTL
Commitment Tracking Table No. 9
CALGARY, Alberta, May 31, 2023 (GLOBE NEWSWIRE) -- Media Advisory – TC Energy Corporation (TSX, NYSE: TRP) (TC Energy or the Company) will host its Sustainable Energy Forum on Tuesday, June 20, 2023, from 7:30 to 9:30 a.m. MDT (9:30 to 11:30 a.m. EDT). François Poirier, TC Energy’s President and Chief Executive Officer, and other leaders will highlight the company’s approach to a sustainable energy future with a focus on answering investor questions around our role in energy transition and...