Results 1871 to 1880 of 4252 for “terms and conditions”
The map depicts the pipeline locations for NGTL Pipeline System in central Alberta.
With this project, 2.9 miles (4.7 km) will be built along with two compressor stations and replacement of 26 miles (41.8) of existing pipeline. The changes will increase capacity by 1.3 billion cubic feet per day.
A natural gas pipeline that will stretch 287 km (178 miles) from end to end, the Tula Pipeline Project will safely deliver fuel from Tuxpan, Veracruz, to communities in the states of Puebla and Hidalgo.
Bear Creek is an industrial cogeneration plant situated on International Paper Grande Prairie pulp mill and Weyerhaeuser saw mill complex. The power plant is configured around a 58 MW natural gas fired turbine.
MacKay River is an industrial cogeneration project that is situated on Suncor’s MacKay River oilsands development, 60 km (37 miles) northwest of Fort McMurray, Alta.
The map depicts the location the Redwater Cogenerating Station which is north of Alberta's provincial capital, Edmonton Alberta.