Results 1851 to 1860 of 3454 for “tariff columbia gas”
tce-FERC-6.85.0-TransCanada-Keystone-Rates-Schedule.pdf
tce-Keystone-FERC-No-6.84.0-Rate-Schedule.pdf
In accordance with Certificate Condition 6 and Order Condition 7, NGTL encloses Commitment Tracking Table No. 9 for the Project. The reporting period for this submission is September 29, 2017 to October 27, 2017.
The Redwater Cogeneration Plant, located at Williams Energy Canada Fractionation and Storage Plant in Redwater, Alta., has provided the province with approximately 46 megawatts of electricity since 2001.
Spanning more than 420 km (261 miles) from Tula, Hidalgo, and ends in Villa de Reyes, San Luis Potosí, the completed Villa de Reyes Pipeline will transport natural gas to power generation facilities in Central Mexico.
Age: 61, City: Seattle, Washington, USA, Director Since: 2011