Results 1841 to 1850 of 4203 for “terms and conditions”
The map depicts the location the Redwater Cogenerating Station which is north of Alberta's provincial capital, Edmonton Alberta.
Prince Rupert Gas Transmission is a proposed 900 km (559 mile) pipeline that will deliver natural gas from a point near Hudson’s Hope to the Pacific NorthWest LNG Facility near Prince Rupert, B.C., Canada.
Spanning more than 420 km (261 miles) from Tula, Hidalgo, and ends in Villa de Reyes, San Luis Potosí, the completed Villa de Reyes Pipeline will transport natural gas to power generation facilities in Central Mexico.
The Guadalajara Pipeline connects to an LNG facility located near Manzanillo on the Pacific Coast of Mexico. It has capacity to transport 500 million cubic feet of natural gas per day to a nearby power plant and transport 320 million cubic feet per day to a pipeline system near Guadalajara.
The map depicts route of Coastal Gaslink west of Dawson Creek to Kitimat, BC.
MacKay River is an industrial cogeneration project that is situated on Suncor’s MacKay River oilsands development, 60 km (37 miles) northwest of Fort McMurray, Alta.
Bear Creek is an industrial cogeneration plant situated on International Paper Grande Prairie pulp mill and Weyerhaeuser saw mill complex. The power plant is configured around a 58 MW natural gas fired turbine.
The Project consists of a 206 kilometre (km), 42-inch pipeline, two compressor stations, and 14 meter stations. It will begin at a the northern point of the existing Saturn section of the Groundbirch Mainline at 14-21-80-20-W6M and terminate at the Blair Creek Receipt Meter Station located in Unit 30, Block K, Group 94-G-7.
The Towerbirch pipeline project will include 55 km of 36-inch pipeline paralleling the existing NGTL Groundbirch Mainline, along with new meter stations, and expansion of one meter station. The majority of this projects scope will be within British Comumbia, with only a portion in Alberta.