Results 171 to 180 of 3797 for “safety orientation for contractors”
Learn how Ingryt Pedroza, a Mexico based engineer, has advanced her career through TransCanada's Mexico scholarship program.
tce-hire-buy local.pdf
As COVID-19 grinds the world to a standstill, the majority of our workforce is adjusting to working from home, and acclimating to our new but temporary reality can prove to be difficult at the best of times. With an added twist, many schools and childcare facilities across North America have shut down in an effort to flatten the curve and reduce the spread of the virus – leaving many of our team members balancing childcare and day-to-day work tasks.
This brochure contains important information about safe excavation near natural gas pipelines.
This report investigates the possible implementation of nuclear power (SMRs) in the oil sands to reduce greenhouse gas (GHG) emissions and produce steam, and electricity for use at in-situ recovery facilities utilizing Steam Assisted Gravity Drainage (SAGD) for bitumen production.
The proposed Grande Prairie Mainline Loop No. 4 (Valhalla North Section) and Berland River Compressor Station C3 Unit Addition will increase natural gas transportation service on our existing natural gas pipeline system in Alberta to meet growing demand.