Showing results 171 to 180 of 2078 for “project 2030”
CALGARY, Alberta, Oct. 29, 2020 (GLOBE NEWSWIRE) -- News Release – TC Energy Corporation (TSX, NYSE: TRP) (TC Energy) announced today that it will move forward with its Wisconsin Access Project to increase natural gas capacity, improve reliability, and reduce emissions on a highly utilized segment of its ANR Pipeline system. The US$0.2 billion project will provide approximately 72 million cubic feet per day of firm transportation service under long-term contracts to utilities serving the...
With this project, 2.9 miles (4.7 km) will be built along with two compressor stations and replacement of 26 miles (41.8) of existing pipeline. The changes will increase capacity by 1.3 billion cubic feet per day.
The fact sheet describes key points about Proposed Project: West Path Delivery Project for NGTL system.
Located entirely within the Municipal District of Bonnyville, this pipeline is south of the City of Cold Lake, Alberta, and is connected to the NGTL System. The existing Cold Lake Border Sales metering facility was replaced with a new metering facility to accommodate the additional gas volumes.