Showing results 1721 to 1730 of 3946 for “contractor log in to safety training”
tc-Keystone-LTD-FERC-5.5.0-Rules-and-Regulations-Tariff.pdf
tc-Keystone-FERC-No-6.78.0-Rate-Schedule.pdf
FERC No. 2.43.0 – Local Pipeline Tariff Containing Rates Applying to the Transportation of Petroleum (effective February 1, 2022)
FERC No. 6.71.0 – Local Pipeline Tariff Containing Rates Applying to the Transportation of Petroleum (effective February 1, 2022)
FERC No. 7.26.0 International Joint Rate Tariff Containing Rates Applying to the Transportation of Petroleum (effective February 1, 2022)
Located in the community of Grande Prairie, Alberta, Bear Creek Cogeneration Plant produces up to 100 megawatts of electricity to both Weyerhaeuser’s Grande Prairie Pulp and Sawmill and Alberta’s competitive electricity market.
The horizontal directional drilling (HDD) the Northern Courier Project completed under the Athabasca River in Alberta, Canada, turned out to be the longest 42-inch-wide HDD completed in North America to date at 2,195 metres (7,200 feet), in order to install the pipeline 70 metres below the riverbed.