Results 161 to 170 of 2064 for “project overview”
Project Details, Schedule, Map, Technology, Design, Emissions Reduction Alberta, Regulatory Process, Site Selection, Engagement, Construction, Benefits, Environment and Contact Information
2024 Notice of Application Filed
News Release — TC Energy Corporation (TSX, NYSE: TRP) (TC Energy) will begin pre-construction activities of the Saddlebrook Solar Project located near Aldersyde, Alberta. TC Energy is investing $146 million to build its first Canadian solar power project. It has the capacity to generate 81 megawatts, enough energy to power 20,000 homes annually. The initial construction includes installing solar panels on TC Energy property in the local industrial park.
Located entirely within the Municipal District of Bonnyville, this pipeline is south of the City of Cold Lake, Alberta, and is connected to the NGTL System. The existing Cold Lake Border Sales metering facility was replaced with a new metering facility to accommodate the additional gas volumes.
The Line 8000 Replacement Project, part of TransCanada’s Columbia Gas Transmission Modernization Program, will replace approximately 13 miles (21 km) of existing 12-inch-diameter bare steel pipeline with new coated steel pipeline.