Results 1681 to 1690 of 3615 for “hse field orientation for contractors”
CALGARY, Alberta, Oct. 23, 2019 (GLOBE NEWSWIRE) -- News Release – TC Energy Corporation (TSX:TRP) (NYSE:TRP) (TC Energy) announced today that 173,386 of its 18,000,000 fixed rate Cumulative Redeemable First Preferred Shares, Series 9 (Series 9 Shares) were deposited for conversion on October 30, 2019 on a one-for-one basis into floating rate Cumulative Redeemable First Preferred Shares, Series 10 (Series 10 Shares). As previously announced in our news release dated September 18, 2019, the...
TC-InvestorDay-2023-Presentation.pdf
tce-FERC-3.3.0-Marketlink-Rate-Schedule.pdf
Power Market Update — March 2022
tce-FERC-2.64.0-Marketlink-Rate-Schedule.pdf
The recent completion of the Murray River Horizontal Directional Drill (HDD) marks a huge milestone for Coastal Gaslink – the largest trenchless water crossing on the project has been completed with zero safety incidents. This 1.3 kilometre section of pipe weighs over 1.2 million pounds, and the 48-inch HDD signifies the largest of its kind for TC Energy and one of the longest in North America. Before work could even begin on-site, years of planning went into making sure everything went smoothly in coordination with our prime contractor Surerus Murphy Joint Venture (SMJV).
tce-FERC-3.7.0-Marketlink-Rates-Schedule.pdf