Results 1581 to 1590 of 3170 for “pipeline spec”
The Project will include the construction of approximately 4 kilometres (km) of pipe 324 millimeters in diameter for transporting natural gas. It will parallel the existing Canadian Mainline, and will start at the Saint-Sébastien Meter Station near route 133 and end at a new proposed valve and receiver site in the municipality of Pike River, near Chemin Molleur.
tce-FERC-2.64.0-Marketlink-Rate-Schedule.pdf
The British Columbia Integrated Pest Management Act & Regulations (IPMA and IPMR) include provisions for pesticide uses under a Pest Management Plan (PMP) – which is referred to as an Integrated Vegetation Management Plan or IVMP in this document. The objectives for the IVMP are to identify pests and set clear, distinct, and tangible thresholds that will assist in determining the level at which vegetation becomes a pest and identifying strategies for control.
tc-energy-integrated-vegetation-management-plan-for-southeast-bc-2024-2029.pdf
2021 NGTL System Expansion — Commitment Tracking Table No. 20