Results 1441 to 1450 of 1902 for “lng export support”
The British Columbia Integrated Pest Management Act & Regulations (IPMA and IPMR) include provisions for pesticide uses under a Pest Management Plan (PMP) – which is referred to as an Integrated Vegetation Management Plan or IVMP in this document. The objectives for the IVMP are to identify pests and set clear, distinct, and tangible thresholds that will assist in determining the level at which vegetation becomes a pest and identifying strategies for control.
tc-energy-integrated-vegetation-management-plan-for-southeast-bc-2024-2029.pdf
The recent completion of the Murray River Horizontal Directional Drill (HDD) marks a huge milestone for Coastal Gaslink – the largest trenchless water crossing on the project has been completed with zero safety incidents. This 1.3 kilometre section of pipe weighs over 1.2 million pounds, and the 48-inch HDD signifies the largest of its kind for TC Energy and one of the longest in North America. Before work could even begin on-site, years of planning went into making sure everything went smoothly in coordination with our prime contractor Surerus Murphy Joint Venture (SMJV).
At TransCanada, we have been providing customized power solutions for businesses and wholesale consumers in Alberta since 1999, and currently manage, operate and markets close to 375 MW of electricity in Alberta
NGTL West Path Delivery 2022 Commitment Tracking Table No. 6
TCEnergy-Rivers-Geographic-Response-Plan.pdf
A nearly decade-long relationship working with the Osage Nation to preserve their heritage.
After more than four years of work, the Mountaineer XPress (MXP) project has become the latest of TransCanada’s U.S. natural gas pipeline projects to be placed in-service, with authorization being granted by the Federal Energy Regulatory Commission on March 1, 2019.