Results 131 to 140 of 1436 for “mainline tariff”
The Canadian Mainline pipeline is 4,114 km (8,770 mile) in length and has safely carried natural gas from the Western Canada Sedimentary Basin (WCSB) to Ontario and beyond throughout its history.
FERC No. 6.72.0 – Local Pipeline Tariff Containing Rates Applying to the Transportation of Petroleum (effective March 1, 2022)
FERC No. 2.43.0 – Local Pipeline Tariff Containing Rates Applying to the Transportation of Petroleum (effective February 1, 2022)
FERC No. 6.71.0 – Local Pipeline Tariff Containing Rates Applying to the Transportation of Petroleum (effective February 1, 2022)
FERC No. 7.26.0 International Joint Rate Tariff Containing Rates Applying to the Transportation of Petroleum (effective February 1, 2022)
FERC No. 2.42.0 – Local Pipeline Tariff Containing Rates Applying to the Transportation of Petroleum (effective January 1, 2022)