Showing results 1351 to 1360 of 3636 for “ngtl gas transportation tariff”
The Line 8000 Replacement Project, part of TransCanada’s Columbia Gas Transmission Modernization Program, will replace approximately 13 miles (21 km) of existing 12-inch-diameter bare steel pipeline with new coated steel pipeline.
Located in Quebec, Bécancour Cogeneration Plant is a high efficient natural gas facility with a production capacity of 550 MW.
tce-TCP-LP_06.30.2025.pdf
The Project consists of a 206 kilometre (km), 42-inch pipeline, two compressor stations, and 14 meter stations. It will begin at a the northern point of the existing Saturn section of the Groundbirch Mainline at 14-21-80-20-W6M and terminate at the Blair Creek Receipt Meter Station located in Unit 30, Block K, Group 94-G-7.
tce-energy-2024-q1-results-presentation.pdf
The reporting period for this submission is July 6, 2018 to October 5, 2018.