Results 1341 to 1350 of 3890 for “contractor log in to safety training”
Power Market Update – August 2024
tce-FERC-No-16.3.0-Zydeco-Pipeline-with-Marketlink-Joint-Tariff.pdf
For Richard Cole, a senior project manager for TC Energy in Charleston, W.Va., his father’s footsteps led him straight into the pipeline industry.
The report for this submission is dated for July 31, 2018 for Albersun Pipeline Asset Purchase Project on Condition 6. The report has a revised Commitment Tracking Table.
The proposed Project consists of two pipeline components which would add up to approximately 85 kilometres (km) of newly constructed 48- inch pipe to the NGTL System, as well as a compressor station unit addition.
CALGARY, Alberta, Oct. 01, 2024 (GLOBE NEWSWIRE) -- News Release – TC Energy Corporation (TSX, NYSE: TRP) (“TC Energy”) today announced that TransCanada PipeLines Limited (the “Company”), a wholly-owned subsidiary of TC Energy, has commenced separate offers (the “Offers”) to purchase for cash any and all of the seven series of outstanding notes of the series listed in the table below (collectively, the “Notes”), up to a maximum of US$1,750,000,000 aggregate Total Consideration (as defined below)....
After heavy flooding exposed pipelines at river crossings, TransCanada used innovative and creative bioengineering solutions to "re-train" the rivers to protect the pipelines, reduce the company's environmental footprint, and create a new habitat for fish. To date, TransCanada’s engineering solutions have met with success, with the provincial regulator approving the engineering practices as a permanent solution.
tce-Keystone-FERC-7.33.0-IJT-Rate-Schedule.pdf
NGTL GP is proposing to permanently cease operations at 14 lateral pipelines or loops on the NGTL System within Alberta as these facilities are no longer necessary to provide service to customers.