Results 1321 to 1330 of 3786 for “right of way maps”
Saddle Lake Lateral - Commitment Table No. 11
TransCanada went to great lengths to ensure that no harm was done to the hundreds of snakes they found during a recent pipeline maintenance project on the prairies of southeastern Alberta. While they may not be cuddly or “aww”-inspiring to many people, snakes play an important role in the ecosystem.
The Project will include the construction of approximately 4 kilometres (km) of pipe 324 millimeters in diameter for transporting natural gas. It will parallel the existing Canadian Mainline, and will start at the Saint-Sébastien Meter Station near route 133 and end at a new proposed valve and receiver site in the municipality of Pike River, near Chemin Molleur.
The Project consists of a 206 kilometre (km), 42-inch pipeline, two compressor stations, and 14 meter stations. It will begin at a the northern point of the existing Saturn section of the Groundbirch Mainline at 14-21-80-20-W6M and terminate at the Blair Creek Receipt Meter Station located in Unit 30, Block K, Group 94-G-7.