Results 1301 to 1310 of 2176 for “ngtl limited partnership”
tce-data-and-information-policy-en.pdf
The Project consists of a 206 kilometre (km), 42-inch pipeline, two compressor stations, and 14 meter stations. It will begin at a the northern point of the existing Saturn section of the Groundbirch Mainline at 14-21-80-20-W6M and terminate at the Blair Creek Receipt Meter Station located in Unit 30, Block K, Group 94-G-7.
This document provides a comprehensive report on a company's activities throughout the preceding year.
The Alberta Carbon Grid (ACG) is a carbon transportation system reaching the province’s largest sources of industrial emissions. Designed to be an open-access system, the ACG will serve as the backbone of Alberta’s emerging carbon capture utilization and storage (CCUS) industry, connecting the Fort McMurray region, the Alberta Industrial Heartland, and the Drayton Valley region to key sequestration locations and delivery points across the province, and serving multiple industries. When fully constructed, the system will be capable of transporting more than 20 million tonnes of carbon dioxide (CO2) annually.
TC Energy Lobbying Information Sheet