Results 1301 to 1310 of 1598 for “map.coastalgaslink.com”
"We do in-line inspections periodically and it gives us an overall health of the pipeline,” John Sadler, Manager of In-line Inspection Canada at TC Energy.
All aspects of the life cycle of a pipeline – from design and construction to operation and retirement – are guided by our comprehensive Operational Management System and strictly overseen by regulatory agencies and government departments. That's why every TC Energy pipeline is rigorously and precisely built with high-quality materials and the latest proven technology, and monitored by expert staff, every step of the way. Take the journey with us, and learn about the life cycle of a pipeline from planning to monitoring and beyond.
TransCanada today announced its Northwest Mainline Loop-Boundary Lake pipeline has been placed into service, completing the final section of its 2017 Expansion Program on the NOVA Gas Transmission Ltd. (NGTL) System.
TransCanada Expects No Material Financial Impact From Proposed Tax Actions by the Federal Energy Regulatory Commission.
TransCanada Corporation announced today that it will move forward with a $2.4-billion expansion of its NGTL System to connect incremental supply and expand basin export capacity by one billion cubic feet of natural gas per day (Bcf/d) at the interconnection with its Canadian Mainline.
TransCanada today announced the appointment of a new independent director, Thierry Vandal.
TransCanada today announced net income attributable to common shares for first quarter 2018 of $734 million or $0.83 per share compared to net income of $643 million or $0.74 per share for the same period in 2017.