Results 1291 to 1300 of 3786 for “right of way maps”
U.S. Travel and Expense analyst, Bryan Espinosa, shares about his heritage and vibrant cultural traditions that have shaped his identity
Saddle Lake Lateral - Commitment Table No. 11
TransCanada today announced its Northwest Mainline Loop-Boundary Lake pipeline has been placed into service, completing the final section of its 2017 Expansion Program on the NOVA Gas Transmission Ltd. (NGTL) System.
The Project will include the construction of approximately 4 kilometres (km) of pipe 324 millimeters in diameter for transporting natural gas. It will parallel the existing Canadian Mainline, and will start at the Saint-Sébastien Meter Station near route 133 and end at a new proposed valve and receiver site in the municipality of Pike River, near Chemin Molleur.
The Project consists of a 206 kilometre (km), 42-inch pipeline, two compressor stations, and 14 meter stations. It will begin at a the northern point of the existing Saturn section of the Groundbirch Mainline at 14-21-80-20-W6M and terminate at the Blair Creek Receipt Meter Station located in Unit 30, Block K, Group 94-G-7.