Showing results 121 to 130 of 1456 for “application status”
Commitments Tracking Table (No. 1 April 2022)
Commitments Tracking Table (No. 1 April 2022)
NGTL Decommissioning Program (2025)
NGTL GP is proposing to permanently cease operations at 14 lateral pipelines or loops on the NGTL System within Alberta as these facilities are no longer necessary to provide service to customers.
TC Energy — Saddle Lake Lateral Loop Project
Located entirely within the Municipal District of Bonnyville, this pipeline is south of the City of Cold Lake, Alberta, and is connected to the NGTL System. The existing Cold Lake Border Sales metering facility was replaced with a new metering facility to accommodate the additional gas volumes.