Results 1241 to 1250 of 4088 for “pipeline terms and conditions”
The Grande Prairie Mainline Loop No. 4 (Valhalla North Section) and Berland River Compressor Station C3 Unit Addition are part of TC Energy’s continued investment in the NGTL System to expand capacity, support system growth and meet growing demand for natural gas in Alberta.
tce-FERC-TransCanada-Keystone-Tariff-Index-Feb-1-2024.pdf
2021 NGTL System Expansion — Commitment Tracking Table No. 18
A proposed natural gas project would double the size of a pipeline that runs through Hampton Roads to accommodate the region’s growing demand. The Columbia Gas Transmission system runs from New York to the Midwest and Southeast. Virginia’s the southernmost of the 10 states it touches. But Virginia Natural Gas says the pipeline infrastructure is outdated and can’t keep up...
2021 NGTL System Expansion — Commitment Tracking Table No. 16
CALGARY, Alberta, March 12, 2020 (GLOBE NEWSWIRE) -- Media Advisory – TC Energy Corporation (TSX, NYSE: TRP) (TC Energy) today announced that its wholly owned subsidiary, NOVA Gas Transmission Ltd. (NGTL), has executed an exclusive letter of intent with Tidewater Midstream and Infrastructure Inc. and TransAlta Corporation to purchase the Pioneer Pipeline for $255 million. The Pioneer Pipeline consists of 131 km of operating pipeline that, upon closing of the transaction, will be integrated...