Results 1211 to 1220 of 3515 for “ngtl gas transportation tariff”
In accordance with Certificate Condition 6 and Order Condition 7, NGTL encloses Commitment Tracking Table No. 8 for the Project. The reporting period for this submission is September 1, 2017 to 28, 2017.
In accordance with Certificate Condition 6 and Order Condition 7, NGTL encloses Commitment Tracking Table No. 7 for the Project. The reporting period for this submission is July 29, 2017 to August 31, 2017.
Unlocking Shareholder Value - Creating two premium energy infrastructure companies
The proposed Project consists of two pipeline components which would add up to approximately 85 kilometres (km) of newly constructed 48- inch pipe to the NGTL System, as well as a compressor station unit addition.
tce-FERC-6.93.0-TransCanada-Keystone-Rate-Schedule.pdf
tce-2024-asm-presentation.pdf
Located entirely within the Municipal District of Bonnyville, this pipeline is south of the City of Cold Lake, Alberta, and is connected to the NGTL System. The existing Cold Lake Border Sales metering facility was replaced with a new metering facility to accommodate the additional gas volumes.